Plant Layout Checklist

Written October 17, 2019

  • Correct local zoning requirements met
  • Floor loads/structural building requirements met
  • Availability of labor considered
  • Building access/exits adequate
  • Departmental relationships considered
  • Customer interaction areas considered
  • Energy sources adequate to total usage
  • Plumbing and sewer connections meet requirements
  • Toilet/Washroom facilities adequate
  • Office equipment/data processing needs considered
  • Office and plant lighting levels adequate
  • Heating/humidity/air conditioning requirements met
  • Noise levels considered
  • Fire safety requirements met
  • Equipment positioning factors considered
  • Personal safety requirements met
  • Materials handling/shipping/receiving areas adequate
  • Warehouse and storage needs met
  • Hazardous materials storage/disposal requirements met
  • Ventilation adequate in all areas
  • Building security considerations addressed
  • Employee lunchroom/breaks areas considered
  • Quality control/product inspection needs met
  • Ancillary activities (woodworking, die making, etc.) considered
  • Future expansion possibilities considered